| Site Engineering Services: * Acceptance Testing * Civil work * Erection & Commissioning * Implementation of Power Systems & DG Sets * Installation |
|
| Network Implementation: Radio trucking equipment: All Installation & commissioning both, indoor & outdoors for: * Base station (Both BSC & BTS) * Switch sites * Antenna and RF Cables Microwave Link : Installation & commissioning of: * IDU * ODU * Antenna and RF Cables * Antenna alignment |
|
| Site and LOS Survey Includes: Green Filed Site Survey: For availability of Main Power & suitability of Site-Lot for civil construction. Existing Site Survey: For availability of Floor Space, Communication Channels, DC Power, Sizing the HVAC, Tower Survey with existing loads etc... Line-of-Sight Survey: To verify the connection possibility between the two sites under study utilizing DGPS Survey Set. Documentation: To gather all the collected information and to introduce a Basic Analysis of site's suitability. |
|
| Major and Minor Civil Design: Major Civil Design: Site Layout Design, Tower Analysis and Suggestion of Reinforcement (if necessary) Electrical Network Design for Grounding, Power Connectivity, Lightning Protection, etc... Minor Civil Design:Antenna Mount and Feeder Gantry, Upgrading of Existing Sites to house the new equipment, Ability to Design a Roof-Top Site. |
|
| Civil Construction: A Complete Site Construction including Foundation Casting, Tower Erection, Equipment & Generator Shelters Erection, Site Fencing and Electrical Network Preparation, Shelter Preparation and Testing at Airtech Warehouses. |
|
| MW Design: * Verify the possible connectivity by means of Collected Data along the path using Differential GPS, and to compare it with the Digital Maps Data-Points as well. * Finding the most suitable Antenna Heights and Mast Height. * Design Optimization by suggestion of Space iversity,Frequency Diversity, Passive Repeaters, Passive Reflectors, etc... |
|
| MW Installation & Testing: MW System Installation, Power-up and Commissioning MW System Testing (Connectivity and Stability Tests) over standard periods to ensure the Application of Design Criteria and to suggest necessary Corrective Action or Optimization MW Network Management System Installation, especially the Far Scan of Harris MW Radios. |
|